CCharge Electrical Contractors slow chargers: prices and map
Charge Electrical Contractors runs 3 slow chargers in the UK (6 charge points, up to 7 kW). Without a subscription, a kWh costs £0.33 to £0.53 (£0.42 on average), all costs included, for a typical charge from 20 to 80 % of a 50 kWh battery.
Chargers3
Max power7 kW
Price per kWh without a subscription, all costs includednumber of chargers per price
£0.42 median
0.290.380.460.54
£0.33 cheapest£0.53 most expensive
The cheapest Charge Electrical Contractors chargers
Sort by
| Charger | Power | Free · live | No subscription |
|---|---|---|---|
| CCharge Electrical Contractors · Stock Hill StudCHEAPESTGillingham7 kW | 7 kW | — | £0.33 |
| CCharge Electrical Contractors · North Cadbury CourtCastle Cary6 kW | 6 kW | — | £0.42 |
| CCharge Electrical Contractors · The Old InnMilborne St Andrew7 kW | 7 kW | — | £0.53 |
Charge Electrical Contractors chargers by county
Sort by
Frequently asked questions
How much does charging with Charge Electrical Contractors cost?
Without a subscription, £0.33 to £0.53 per kWh depending on the charger (£0.42 on average), all costs included, i.e. about £12.68 for 30 kWh.
Is there a cheaper Charge Electrical Contractors subscription?
Kargit knows of no subscription that lowers the price with Charge Electrical Contractors: the price without a subscription is the best.
Prices updated on 16/11/2026. Data sources