CCogent Energy slow chargers: prices and map
Cogent Energy runs 2 slow chargers in the UK (10 charge points, up to 22 kW). Without a subscription, a kWh costs £0.55 to £0.87 (£0.71 on average), all costs included, for a typical charge from 20 to 80 % of a 50 kWh battery.
Chargers2
Max power22 kW
Price per kWh without a subscription, all costs includednumber of chargers per price
£0.71 median
0.290.380.460.54
£0.55 cheapest£0.87 most expensive
The cheapest Cogent Energy chargers
Sort by
| Charger | Power | Free · live | No subscription |
|---|---|---|---|
| CCogent Energy · Cogent Energy - The BarnCHEAPESTDaresbury22 kW | 22 kW | — | £0.55 |
| CCogent Energy · The Bowling GreenManchester22 kW | 22 kW | — | £0.87 |
Cogent Energy chargers by county
Sort by
Frequently asked questions
How much does charging with Cogent Energy cost?
Without a subscription, £0.55 to £0.87 per kWh depending on the charger (£0.71 on average), all costs included, i.e. about £21.27 for 30 kWh.
Is there a cheaper Cogent Energy subscription?
Kargit knows of no subscription that lowers the price with Cogent Energy: the price without a subscription is the best.
Prices updated on 16/11/2026. Data sources